SAGE EMG guidance on ventilation and COVID-19
On 23 October 2020, the UK Scientific Advisory Group for Emergencies (SAGE) published an Environmental and Modelling Group (EMG) paper on the Role of ventilation in controlling SARS-CoV-2 transmission. This paper examines public and workplace settings. Ventilation in domestic environments was covered in the Scientific Pandemic Influenza Group on Behaviours (SPI-B) and EMG paper, MHCLG housing impacts paper published on 10 September 2020.
[edit] Highlighted recommendations
The paper includes guidelines for better ventilation and indoor air quality in buildings, and introduces proactive measures that should be taken as facilities management teams prepare for employees to return to the workplace.
Recommendations include:
- Developing a risk mitigation plan to weigh up the consequences of opening windows to minimise the spread of infection against thermal discomfort, energy cost, noise disruptions, security and health and wellbeing impacts from exposure to pollutants.
- Identifying parts of the building that have poor ventilation rates (less than five litres per second per person or more than 1500ppm CO2) and prioritise them for remediation.
- Increasing ventilation in areas where there is a greater chance of virus transmission (either through greater concentration of employees or activities that occur in those areas).
The guidance was updated on 23 December 2020 to reflect the more aggressive variant of COVID-19 that was identified in the UK in late 2020.
[edit] Related articles on Designing Buildings Wiki
- Back to the workplace: are you prepared?
- Coronavirus and the construction industry.
- Designing HVAC to resist harmful microorganisms.
- Facilities management.
- Health performance indicators in the built environment.
- IAQ developments accelerated by COVID-19 pandemic.
- Ventilation and control of COVID-19 transmission.
[edit] External resources
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.